Enhance construction issue tracking for improved project management outcomes
Oracle Construction and Engineering
UX
Design Challenge
Problem Solving
Project Overview
This was a design challenge I completed as part of Oracle's interview process.
Challenge: Oracle Field's issue tracking was a bit too rigid for the diverse world of construction.
Impact: This meant slower work, missed issues, and a lot of frustrated folks on site.
Solution: I proposed implementing in a tagging feature to make issue labeling flexible and fast.
Problem
The current system fails to support complex inspections beyond simple defects.
Fixed data fields cannot capture crucial details specific to different user types:
Safety Inspectors need severity ratings (low, medium, high)
Quality Inspectors require prioritization
Project Managers need cost impact information
Hypothesis
Introducing a tagging system will:
Provide flexibility to capture varied issue details
Improve data quality and relevance for different stakeholders
Enhance categorization and customization of issue types without compromising speed of capture
Goal
I aimed to design a flexible tagging feature to:
Allow users to create and assign custom labels to issues
Enable quick issue logging while supporting diverse information needs
Improve the efficiency and effectiveness of construction management across different inspection types